Rules
0
Project quality gates
Evidence
Use findings pages to triage rule results and assemble engineering evidence.
Outcome: Findings are curated into a defensible evidence set for engineering reports.
Rules
0
Project quality gates
Findings
0
Generated for selected log
Open
0
Awaiting disposition
High severity
0
Critical review candidates
Engineers triage generated findings for assigned logs, confirm engineering meaning, and move report-ready evidence forward.
Review open threshold findings, severity, observed value, status, and report readiness.
triage queue
Inspect generated findings as an engineering event sequence across the selected log.
time order
Package source file, rules, findings, and downstream report context for review.
review package
Threshold excursion size, review state, and rule traceability for the selected evidence set.
Open findings
0
0 total generated
High severity
0
requires engineering review
Avg excursion
-
observed vs threshold
59%
Scores findings availability, severity load, open state, and rule traceability.
run processing first
Generated threshold, duration, and calibration events for the selected evidence file.
| Finding | Signal | Observed | Threshold | Severity | Status | Created | Action |
|---|
| Rule | Signal | Condition | Severity | Status |
|---|