Rules

Evaluation

Active
Current workspace: Rules
Page usage manualManual

Evaluation guide

Use rules pages to define, tune, and evaluate threshold or duration gates.

What it provides

  • Project rule library, templates, calibration limits, and evaluation controls.
  • Severity, duration gate, threshold, and status management.
  • Generated findings when processed signals breach defined limits.

How to use it

  1. 1. Run active project rules against processed signal statistics.
  2. 2. Select the project and processed log file.
  3. 3. Review active rules and calibration limits.
  4. 4. Run evaluation and inspect generated findings.

Outcome: Signal behavior is converted into reviewable engineering findings.

Processed logs

0

Ready for rule evaluation

Active rules

0

Enabled checks

Findings

0

Selected log output

High severity

0

Needs review

Project Evaluation Context

Select an assigned project, choose a processed log, and run the active quality-gate set against signal statistics.

Rule Coverage Analytics

Quality-gate coverage across signals, active thresholds, duration checks, and generated findings.

Active gates

0%

0 enabled rules

Signal coverage

0

unique rule targets

Critical review

0

high severity findings

Gate readiness

25%

Balances activation state, duration gates, and unresolved high-severity load.

Severity distribution

No datawaiting for evidence

Calibration review cues

  • 01Add duration gates for transient-prone vehicle signals.
  • 02Create rules against processed signals before finding review.
  • 03No high severity findings are pending on the selected log.

Evaluate Active Rules

Run the active project rule set against a processed log file.

No processed log files are ready. Complete a processing job before evaluating rules.

Generated Findings

Findings refresh immediately after rule evaluation.

Findings Workflow
FindingSignalObservedThresholdSeverityStatus
Loading...